Canvey Railway and Model Engineering Club.
In 2000 the track was first loose laid around the garden.
Using some bricks to gauge the height of the track.
Dave's daughters dog Lucy chilling & thinking ?**? while a double header goes by.
The goldfish & koi with the village at the back of the Bala pond.
The bridge and Lucy
Bridge over the Bala pond.
Dave cutting once and measuring 3 times for the track bed.
|