Canvey Railway and Model Engineering Club.

Around the Bala Pond
09-07-23

 

In 2000 the track was first loose laid around the garden.

Using some bricks to gauge the height of the track.

Dave's daughters dog Lucy chilling & thinking ?**? while a double header goes by.

The goldfish & koi with the village at the back of the Bala pond.

The bridge and Lucy

Bridge over the Bala pond.

Dave cutting once and measuring 3 times for the track bed.

Around the Bala Pond